Overview of Cam Pha Thermal Power Plant
-
-
Location: Cau 20 area, Cam Thinh Ward, Cam Pha City, Quang Ninh Province, Vietnam.
-
Investors: Vietnam National Coal-Mineral Industries Group (Vinacomin), Vinaincon, and local coal companies.
-
Total Capacity: 600 MW with an annual electricity output of 3.68 billion kWh.
-
Configuration: Consists of 2 units with 4 boilers (150 MW each).
-
Technology: Utilizes Circulating Fluidized Bed (CFB) combustion technology.
-
Fuel Source: Low-grade coal (Anthracite Cam 6) and peat supplied by local mines via the Cua Ong Coal Selection Plant.
-
Environmental Protection: Uses limestone injection for desulfurization and electrostatic precipitators (ESP) for dust filtration.
-
Cooling System: Uses seawater via a 300-meter open-channel system connected to Bai Tu Long Bay.
-
Grid Connection: Connected to the national grid via 110 kV and 220 kV lines, serving the Hanoi-Quang Ninh-Hai Phong economic triangle.
-
Project Phases:
- Phase 1: Construction started April 15, 2006; Unit 1 began generating in July 2009.
-
-
-
- Phase 2: Construction started December 28, 2007; Unit 2 began generating in October 2010.
-